How many pavers do you need?
Enter the patio or walk size and the paver’s face dimensions. Joints are added to each paver (CMHA describes typical joints of 1/16–3/16 in.). Bedding sand defaults to a 1-inch nominal layer from the same guide spec. Base thickness is a design choice — enter what your installer specifies.
Project details
Enter the dimensions to see a planning estimate.
How this is calculated
What the CMHA guide spec actually says
Concrete Masonry & Hardscapes Association, PAV-GSP-011-21 (2021) describes a nominal 1 in. bedding-sand layer and typical joint widths of 1/16 to 3/16 in. It also discusses paver thickness for traffic: vehicular pavers are described at a 3.125 in. minimum, and some residential driveways can use 2.375 in. units. That is about the unit, not about the base.
Base thickness depends on soil and load. We will not invent a single default (for example “always 6 inches”) and present it as if it were in the spec. Enter the depth from your drawing or installer; the calculator then reports cubic yards of base over the plan area, including the waste percentage you set.
Example: a 10 × 12 ft patio (120 sq ft) of 8 × 4 in. pavers with a 1/8 in. joint has a unit area of 8.125 × 4.125 ÷ 144 = 0.2327 sq ft, or about 516 pavers before waste, 568 after 10% (rounded up). One inch of bedding sand over 120 sq ft is 10 ft³ (0.37 yd³) before extra, 0.41 yd³ with 10%.
FAQ
How much sand do I need under pavers?
CMHA PAV-GSP-011-21 describes a nominal 1 in. bedding-sand layer. Over 100 sq ft that is 8.33 ft³, or 0.31 yd³, before any extra. Confirm the thickness your installer will actually place.
Do you include a default base?
No. Base depth is a design choice for soil and traffic. Enter it to see a volume; leave it blank and we will not invent one.
Should I add extra pavers?
Cuts, breakage, and future repairs are why the waste field exists. We default to 10% as a planning allowance you can change, not as a cited CMHA requirement.